NORAC UC4+BC+JD10 User Manual
Page 29
26
10. Connect S3 on cable C13 to the valve
extension cable C11.
11. Route the free end of C13 under the
sprayer to the shuttle valve manifold.
Unplug the load sense jam valve connector
(Figure 38) and plug in the tower
connector from C13. Connect the load
sense jam valve connector to the free
connector on C13.
Figure 38: Load Sense Jam Valve
Connector
12. Connect the six pin shroud (T6B) on cable
C17 to the mating tower on the valve
extension cable (C11).
13. Connect the three pin tower (T3) on cable
C17 to the mating tower on the valve
extension cable (C11).
Two connectors on C17 will remain
disconnected. These are used when
installing other UC4+ options.
14. Install the two 2-pin connectors on the end
of cable C17 to the 3
rd
station of the block
as per Figure 37.
The connector marked “Main Up”
goes on the same side of the block as
the hoses.
15. Connect the CAN Node cable (C02B) to
P4 on the valve extension cable (C11).
16. Route the CAN Node cable (C02B) to the
two roll sensors which are installed in
Section 4.5. Follow existing cables and/or
hydraulic lines.
17. Connect the 4-pin AMP connectors on
C02B to the roll sensors.
18. Connect the sensor branch cable (C02) to
the 4-pin AMP plug on C02B.
19. Route the sensor branch cable (C02) to the
wing and main sensors and connect to the
sensors. Follow existing cables and/or
hydraulic lines along the boom.
Route the main lift cable through the
main lift mounting bracket tube to
provide additional cable protection
20. Cable-tie the installed cables every 12
inches.
Connector
Location
Connector