beautypg.com

NORAC UC4.5-BC-RG6 User Manual

Page 30

background image



27

8.5 Hydraulic Plumbing for RG6 (Flat Faced O-Ring Fittings)

From this point on in the installation the booms will be inoperative until the
hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Disconnect the tank line at the sprayer’s valve block and insert the 8FORXR 8MORT tee

(F03.

3. Connect hose H05 to the tee and route to the NORAC valve block.

4. Disconnect the pressure line at the sprayer’s valve block and insert the 6FORXR 6MORT

tee (F02).

5. Connect hose H04 to the tee and route to the NORAC valve block.

Figure 23: Sprayer Pressure and Tank Plumbing

6. Connect hose H04 to the pressure port and hose H05 to the tank port on the NORAC

valve block.

7. Connect H07 and H08 to the “B” ports on the NORAC valve block. Route the hoses to

the tilt cylinders. H08 is longer than H07 since the NORAC valve block is normally located
on the right side of the sprayer.

8. Disconnect the existing hoses from the tilt cylinders and connect H07 and H08 to the

cylinders using the 12FORX 6MOR fittings (F05).

9. Install a 12MORP plug (F06) onto the ends of the existing raise lines that were just

removed.

10. The existing lower lines do not need to be modified. Leave these lines connected to the

sprayer valve block.

This manual is related to the following products: