7 electrical installation – NORAC UC4.5-BC-NT3 User Manual
Page 18
15
7 Electrical Installation
1. Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it
will be clearly visible and within easy reach of the operator.
A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the
Roll Over Protection Bar. Four pilot holes for the screws provided need to be drilled to
facilitate the control panel mounting.
Another option is to purchase an adapter for the flexible panel mount that has a 3/8" NC
threaded stud on the end to bolt through an existing mount. These can be found at your
local outdoor store as a RAM mount part number RAM-B-236. (See
http://www.ram-
mount.com/
)
Figure 14: Cable Configurations: C01, C04, C06 and C10
2. Connect the UC4.5 power cable (C10) to the 16-pin connector on the back of the UC4.5
Control Panel in the cab. Connect C01 to the 4-pin connector on the back of the UC4.5
Control Panel. Cable tie C10 and C01 to the RAM mount to help provide strain relief.
3. Connect C06 to C01 using the 2-way coupler (E12).
4. Connect C04 to the 6-pin tower on C10.
5. Connect the 3-pin power connector from C10 to the power bar on the right hand side of
the cab.