beautypg.com

9 software setup – NORAC UC4.5-BC-JD11 User Manual

Page 26

background image



24

9 Software Setup

1. Start up the sprayer and test the sprayer’s functionality. The NORAC control panel does

not need to be powered on for the original boom function switches to operate. Unfold the
booms and raise/lower each boom and the main section.

Confirm that the cabling and hoses are agreeable to the entire range of motion.

2. If any functions do not work, review the hydraulic and electrical portions of this manual to

check for proper installation.

3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis.

4. The procedure for the installation of the UC4.5 Spray Height Control system is now

complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC4.5

Spray Height Control Operator’s Manual (M01).