7 electrical installation – NORAC UC4.5-BC-JD11 User Manual
Page 20
18
7 Electrical Installation
1. Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it
will be clearly visible and within easy reach of the operator.
A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the
Roll Over Protection Bar. Four pilot holes for the screws provided need to be drilled to
facilitate the control panel mounting.
If desired, a mounting bracket (part #A53255) can be purchased from your local John Deere
dealer to allow the UC4.5 control panel to be mounted to the existing John Deere terminal
mount. Another option is to purchase an adapter for the flexible panel mount that has a
3/8" NC threaded stud on the end to bolt through the existing JD mount. These are
available at your local outdoor store as a RAM mount part number RAM-B-236. (See
http://www.ram-mount.com/
)
Figure 19: Cable Configurations: C10, C11 and C30
2. Connect the UC4.5 power cable (C10) to the UC4.5 Control Panel in the cab. Ensure that
both plugs (P16 and P4) are connected to the panel. Cable tie C10 to the RAM mount to
help provide strain relief.
Ensure the UC4.5 Control Panel’s power is OFF for the remaining installation.
(Bottom of switch pressed IN).
3. Connect C30 to P6A of C10 using a 2-way coupler (E12). Plug the 3-pin connector on C30
to an appropriate power outlet inside the cab.
4. Connect P12/P6 on C10 to R12/R6 of C11.
5. Route C11 to the rear of the sprayer near the sprayer valve block. Run the cables along
the sprayer frame with the JD harness.