beautypg.com

3 valve block mounting – NORAC UC4.5-BC-HD7 User Manual

Page 27

background image



24

8.3 Valve Block Mounting

Ensure that no hydraulic components will interfere with any sprayer parts or be
pulled tight at any time.

The recommended mounting location is on the rear of the boom main section

near the Hardi valve block.

1. A suitable mounting location for the valve block is illustrated in Figure 23.

2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes

are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.

3. Use the remaining hardware to secure the block to the sprayer.

4. Cut off excess threaded rod, if necessary.

Figure 23: Valve Block Mounting