4 existing system check – NORAC UC4.5-BC-HD7 User Manual
Page 12
9
4 Existing System Check
1. Before beginning the install, ensure all hydraulic boom functions are operating properly on
the sprayer.
All Fold Functions
Main Lift Function
Wing Tilt Functions
Slant Function
2. Inspect slide pads and wear surfaces for excessive wear. Replace or adjust if necessary.
3. Ensure the boom guide-rods are set to the “tapered” position (factory setting).
4. Set boom suspension to be critically damped (Figure 5). Adjust the boom damper
accordingly.
a. Unlock the pendulum, and push boom tip down approximately 75 cm (30 inches).
b. Hold the boom steady for a moment, and release.
c. Ensure the boom returns to its relaxed state as quickly as possible, with little to no
overshoot.
Figure 5: Boom Push Test- Critically Damped
5. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.).
6. Ensure all boom-fold operations are functional (place a check mark in boxes below).
7. Bring engine to field-operational RPM and record.