beautypg.com

7 software setup – NORAC UC4.5-BC-GN6 User Manual

Page 20

background image



17

7 Software Setup

1. Start up the sprayer and test the sprayer’s functionality. The control panel does not need

to be powered on for the original boom function switches to operate. Unfold the booms
and raise/lower each boom and the main section.

Confirm that the cabling and hoses are agreeable to the entire range of motion.

2. If any functions do not work, review this manual to check for proper installation.

3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis.

4. The procedure for the installation of the UC4.5 Spray Height Control system is now

complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC4.5
Spray Height Control Operator’s Manual (M01).