beautypg.com

2 hydraulically teed installation – NORAC UC4.5-BC-GN1 User Manual

Page 25

background image



22

7.2 Hydraulically Teed Installation

Figure 24: Cable Layout for Hydraulically Teed Installations

1. To interface with the sprayer’s main lift hydraulics, the valve interface cable (C12) shown in

Figure 24 can be used.

2. It may be necessary to connect to the Bypass valve. To do this use the bypass interface

cable (C13) as shown in Figure 24.

3. To control boom slant (roll), it will be necessary to use the roll cable (C16).

See UC4.5-BC-CABLE-GUIDE cable ordering guide for more information.