NORAC UC4.5-BC-AP3 User Manual
Page 21
18
Figure 20: Cable Configurations: C03, C11, C12 and C13
6. Run cable C11 to the rear of the sprayer, in the vicinity of the valve block.
7. Connect the 3-pin shroud (S3) on the sense cable (C13) to the mating connector (T3) on
C11).
8. Route the free end of C13 to the Apache valve block and insert all of the 2-pin tees
between the matching Apache valve connections. For each tee, the function (e.g. “Left Up”)
is labeled on the branch wire.
9. Connect the 6-pin shroud (S6) on the main lift valve cable (C12) to the mating connector
(T6) on C11.
10. Route the free end of C12 to the vicinity of the Apache main lift valve and insert the 2-pin
tees between the matching Apache valve connections. For each tee the function (e.g. “Main
Up”) is labeled on the branch wire.
11. Connect the valve interface cable (C03) to connector S6 on the valve extension cable
(C11).
12. Connect the 2-pin connectors on the valve interface cable to the NORAC valve block, as
shown in Figure 21.
13. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT DOWN
and LEFT DOWN. Cables labeled with UP go on the same side as the hydraulic hoses.