National Cart CCS-2766-0597B METAL COVERED CART CORRAL User Manual
Page 13

13
12. Install one “J” channel (F) per 15’ section, repeat on other 15’ section, secure at locations H1 through H9,
using #12 x 1” tek screws making sure that the screws are passing through the maxi rib panel (E), the “J”
channel (F), and the header (C). Also, make sure that the maxi rib panel is inside the “J” channel.
13. Repeat step 12 for opposite side of corral.
POLYGAL ASSEMBLY
14.
A. Place one “H” channel (I) into “J” channel (F) at every location except both entry ends or the center
locations (header/sign assembly). Making sure that the “H” channel (I) is all the way up in the “J”
channel and centered with the header. Secure through the top hole of the two pre-drilled holes in the
center of the “H” channel.
DO NOT OVER TIGHTEN