beautypg.com

Installation instructions, Epl envoy, Sheet 2 of 3 – Cooper Lighting McGraw-Edison IMI-6950 User Manual

Page 2: Task light field installation kit

background image

LUMINAIRE RE-INSTALLATION:
1. Note:
Install lens to housing if removed during drilling. Reverse Step 3.
2. Secure hanging hook into the rear hooks of quick mount plate

(Figure 3 & 4).

3. Make wiring connection while luminaire is being suspended from hanging

hook.

4. Push excess wires and connectors up into the junction box.
5. Lift up luminaire onto the (4) four hooks of quick mount plate while guiding

the wires through center access hole (Figure 3).

6. Push luminaire forward for engagement. When it reaches the full-engaged

position, a “CLICK” can be heard.
CAUTION: If full engagement is not reached, it is not yet rigidly installed.

EPL Envoy

Task Light Field Installation Kit

Sheet 2 of 3

4/7/08

IMI-695D

INSTALLATION INSTRUCTIONS

IMPORTANT : READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN FOR FUTURE REFERENCE

Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 ADH080775

These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible contingency during installation,
operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please contact your nearest representative.
NOTE: Specifications and dimensions subject to change without notice.

Figure 6

Figure 4

FRONT HOOKS

LUMINAIRE
HANGING HOOK

REAR HOOKS

QUICK MOUNT
PLATE

Figure 5

LATCH

#8-32
SCREW

RETAINER

CENTER ACCESS HOLE

THUMB
SCREW

UPPER
REFLECTOR