beautypg.com

C) install guardrail rear support posts, D) install guardrail side support post – Jaypro Sports BLCH-521GR User Manual

Page 6

background image

© 2009 Jaypro Sports Equipment JSL-Inst037 Rev A 08/05/2010

6 of 9

c) Install Guardrail Rear Support Posts:

1) Install one guardrail rear support post (20) at the rear of each frame as shown above,

inserting the mounting flange for the support post between seat plank (4) and frame (1)
(tighten hardware only finger tight at the point).

2) Install the hardware securing the vertical mounting flange of the guardrail support post to

the frame, as shown above.

d) Install Guardrail Side Support Post:

1) Attach one guardrail side support (21) to the underside of the fourth seat plank, using the

hardware shown above. Leave hardware finger tight to allow for future adjustment.

2) Repeat step 1 for the other side of bleacher.


5/16”-18 x 1-1/4” CARRIAGE BOLT, ZP (8)

5/16”-18 FLANGE HEX NUT, ZP (11)

TYP 5

th

ROW SEAT PLANK ATTACHMENT:

5/16”-18 x 1-1/2” CARRIAGE BOLT, ZP (9)
5/16” BOLT CLIP (5)
5/16”-18 FLANGE HEX NUT, ZP (11)

REAR SUPPORT POST (20)

STADIUM SEAT
PLANK, 1 ½” x 9 ½”
x 15 ft / 21 ft (4)

5-ROW BLEACHER LEG (1)

5/16”-18 x 1-1/4” CARRIAGE BOLT, ZP (8)

5/16” BOLT CLIP (5)

5/16”-18 FLANGE HEX NUT, ZP (11)

(EACH POST REQUIRES 4 ANCHORS)

SIDE SUPPORT POST (21)

2” x 2” BLACK SQUARE TUBE CAP (15)
(BOTH TOP AND BOTTOM)

STADIUM SEAT PLANK,

1 ½” x 9 ½” x 15 ft / 21 ft (4)

This manual is related to the following products: