Set-up, Shear pins, Chute clean-out tool – Cub Cadet 945 SWE User Manual
Page 8: Chute directional control, Chute assembly
3.
Secure flange keeper removed earlier with lock nuts and
screws. Tighten down nuts securing the other two flange
keepers. See Fig. 3-5.
4.
Check that the chute cables are properly routed through
the cable guide attached to the lower handle assembly. See
Fig. 3-6.
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
have been included with your snow thrower. There are holes
provided in the plastic dash panel for convenient storage of the
shear pins. Push the pins through the holes in the dash panel and
secure with the bow-tie cotter pins. See Fig. 3-7.
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
the cable tie before operating the snow thrower. See Fig. 3-8.
Chute Directional Control
1.
Remove the hairpin clip from the spiral control as shown in
A of Fig. 3-4.
2.
Insert the chute directional control rod into the fitting on
the spiral control as seen in B of Fig. 3-4.
3.
Secure with the hairpin clip previously removed.
Chute Assembly
1.
Remove lock nuts and screws securing one of the flange
keepers to the chute assembly. Loosen the fasteners of the
other two flange keepers. See Fig. 3-5.
2.
Place chute assembly onto chute base as shown in Fig.
3-6. Make sure that the chute notches engage with the
spiral end of chute directional control, and the two flange
keepers are beneath the flange on the chute base.
Figure 3-5
Figure 3-4
Figure 3-6
A
B
Figure 3-7
8
S
ection
3— A
SSembly
& S
et
-U
p