Receiving and Installation

Before you sign the Bill of Lading

:

1. Receiving- Inspect units inside and out for signs of damage

Verify all components are delivered per the Bill of Materials.

Report damage to Energenics and the carrier IMMEDIATELY.
Note ALL damage on the Bill of Lading.
This is your responsibility and you must file all claims

.

The filter is fully assembled and ready for installation. The
control, valves, and flex connector are in the cardboard box.


2. Installation- Follow instructions herein:

Determine the location with reference to minimum duct work from the dryer
and ease of access for inspection.

If using a lint drop pipe allow enough room for lint to travel down 4’ before the
first bend. Max bend angle is 30 degrees.

Make sure there is adequate clearance is for the lint drum at the bottom of the
filter.

Conduit or Sealtight between filter junction boxes should be ¾ inch.

Dependant on options ordered, not all outputs will have connected
components.

When mounting the filter overhead, mount the control below the filter where it
can be easily accessed.

*NO BIRDSCREENS ON EXHAUST*