Maintenance schedule, X x x – EDCO ALR-BS User Manual
Page 11
Printed in USA
TVW
©2006
Page 11
E-ALRE-I-0706
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com • Email: [email protected]
Repairs are to be done
by authorized EDCO
Dealers only.
Read and follow instruc-
tions in the motor owner’s
manual.
Maintenance Schedule
Every 100 Hours of Operation
Daily
X
X
X
All maintenance to
be performed by
qualifi ed
personnel.
Visual Inspection of
Entire Tool
Check chisel for
damage/uneven wear
X
X
X
X
Lubricate
Clean Dust & Dirt
Off of Tool
Check “O” Rings
Replace “O” Rings
Flush Tool
Before Operation
As Required
Every
Tool Flush
Operational Keys to good equipment care and long life...
1. Before each use, check and insure all hardware, nuts, bolts and fi ttings are tight
and not worn or damaged. If damaged or missing hardware is noted, it should be
replaced before the tool is put back into service.
2. Check the maintenance instructions for important information about lubrication
intervals. Remember, equipment used in a dusty environment has more frequent
lubrication requirements than equipment that is not used in a dusty environment.
3. After each days use, the chisel scaler should be cleaned. When cleaning, cover
any openings to prevent contaminants from entering the equipment.