D.A.S. Audio Aero 50 User Manual
Page 13
Once the first box has been placed at 0º
and raised approximately 75cm (30 in) the second
box of the array can be placed nearby. Once
located in position, the G2A48 guides of the
second box should be freed and inserted in the
rear located receiving points of the suspended box
and secured with the safety pins.
Once the splay angle between the first
two boxes has been determined, the front of the
box can be lifted into place. Three people will be
needed to undertake this operation, two to lift the
box and one to fit the G1A50 guide and safety
pins into the upper box.
8
Manual del Usuario
/ aero 50 / User’s Manual
See also other documents in the category D.A.S. Audio Audio:
- Aero 12 (15 pages)
- Aero 20A (18 pages)
- AX-Aero40S2 (2 pages)
- AXU-VA24 (1 page)
- AXU-VA4 (1 page)
- AXW-3 (2 pages)
- DASnet Splitter (12 pages)
- DASnet V1.5 (70 pages)
- Event series (19 pages)
- DAS Loader V1.1 (13 pages)
- VA Systems (15 pages)
- WR Systems (18 pages)
- Convert 15A series (22 pages)
- Convert 15A series Rigging (20 pages)
- Aero 40A (21 pages)
- Aero 40A Rigging (39 pages)
- AXU-WR6412 (2 pages)
- AXU-WR6415 (2 pages)
- LX-218A (18 pages)
- Aero 28 Series (28 pages)
- ST Series (24 pages)
- Compact Series (44 pages)
- SM Series (24 pages)
- Variant Series Systems Guide (14 pages)
- CSA Series (32 pages)
- SLA Series (28 pages)
- H Series (24 pages)
- PS Series (28 pages)
- Energy Series (28 pages)
- DSP-26 (48 pages)
- Sub-18HA (24 pages)
- Rf Series (24 pages)
- Artec Series (2 pages)
- Pf Series (2 pages)
- MI Series (2 pages)
- DR Active Series (20 pages)
- DR Series (2 pages)
- Factor Series (2 pages)
- Arco 12 Sub (2 pages)
- Arco Series (2 pages)
- CL Series (24 pages)
- Bidriver Plus (1 page)
- Aero 38A (26 pages)
- Avant Series (26 pages)
- DSP-48 (28 pages)