Installation instructions (cont’d), Installation checklist – Kenmore POWER MISER 153.336851 User Manual
Page 16
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Installation Checklist
BEFORE LIGHTING THE PILOT:
• Check the gas lines for leaks.
a. U
k
a soapy water solution. DO NOT test for gas leaks
using a match or open flame.
b. Brush the soapy water solution on all gas pipes, joints and
fittings.
c. Check for bubbling soap. This means you have a leak.
Turn OFF" gas ana make the necessary reoairs.
Installation Instructions (cont’d)
gas
d. Recheck for leaks.
necessary repairs.
e. Rinse off soapy solution and wipe dry.
Is the new temperature-pressure relief valve properly installed
and piped to an adequate drain? See “Temperature-Pressure
Relief Valve” scaion.
Are the cold and hot water lines connected to the water
heater correctly? See “Water Piping” instructions in the
Installation Instructions” section.
Is the w^ter heater completely filled with water? See “Filling”
instructions in the “Installation Instructions” section.
Will a water leak damage anything? See the “Facts to
Consider About the Location” section.
Is there proper clearance between the water heater and any
thing that might catch fire? See the “Facts to Consider About
the Location” section.
VENT PIPE TO
OUTDOORS
OR CHIMNEY
SHUTOFF VALVE
Do you have adequate ventilation so that the water heater
will ojïcratc propeny? Sec “Combustion Air and Ventilation”
in the “Instaflation Instructions” section.
Is the draft hood vejit piping properly secured? See “Venting”
instructions in the “Installation Instructions” section.
Is there proper clearance between the vent pipe and anything
that might catch on fire? See “Venting” instructions in the
“Installation Instructions” section.
Is the vent pipejiroperly sloped and does the vent terminate
outdoors?
See
Venting”
instructions
in
the
“Installation
Instructions” section.
Do you need to call your gas company to check the gas pipe
and its hookup?” section.
16