beautypg.com

Kenmore THE ECONOMIZER 153.33205 User Manual

Page 21

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

R Deburring

Use a knife, plastic pipe deburring tool, or file to remove burrs from the end
of small diameter pipe. Be sure to remove a!! burrs from around the inside
as well as the outside of the pipe. Aslight chamfer (bevel) of about 10°-
15° should be added to the end to permit easier insertion of the pipe into
the end of the fitting. Failure to chamfer the edge of the pipe may remove
cement from the fitting socket, causing the joint to leak.

C. Test dry fit of the joint

Tapered fitting sockets are designed so that an interfaced fit should
occur when the pipe is inserted about 1/3 to 2/3 of the way info the
socket. Occasionally, when pipe fitting dimensions are at the
tolerance extremes, it wifi be possible to fully insert dry pipe to the
bottom of the fitting socket. When this happens, a sufficient quantity
of cement must be applied to the joint to fill the gap between the pipe
and fitting. The gap must be filled to obtain a strong, leak-free joint.

D. Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove
all dirt, grease or moisture with a clean dry rag. If wiping fails to
clean the surfaces, a chemical cleaner must be used. Check for
possible damage such as splits or cracks and replace if necessary.

Depth-of-entry
Marking the depth of entry is a way to check if the pipe has reached
the bottom of the fitting socket in Step F. Measure the fitting depth
and mark this distance on the pipe O.D. You may want to add
several inches to the distance and make a second mark as the
primer and cement will most likely destroy your first one.

Apply primer fo the surface of the pipe and fitting socket with a natural

bristle brush. This process softens and prepares the PVC or CPVC for
the solvent cementing step. Move quickly and without hesitation to the
cementing procedure while the surfaces are still wet with primer.

E Application of solvent cement

• Apply the solvent cement evenly and quickly around frie outside of the

pipe at a width a little greater than the depth of the fitting socket.

• Apply a light coat of cement evenly around the inside of the

fitting socket. Avoid puddling.

• Apply a second coat of cement to the pipe end.

Cans of cement and primer should be closed at al!

times when not in use to prevent evaporation of
chemicals and hardening of cement.

They are also very flammable and should be kept
away from heat or flame.

STIPE

F. Joint assembly

Working quickly, insert the pipe into the fitting socket bottom and
give the pipe or fitting a 1/4 turn to evenly distribute the cement. Do

not continue to rotate the pipe after it has hit the bottom of the fitting

socket, A good joint will have sufficient cement to make a bead all
the way around the outside of the fitting hub. The fitting will have a
tendency to slide back while the cement is still wet so hold the joint
together for about 15 seconds.

G. Cleanup and Joint movement

Remove all excess cement from around the pipe and fitting with a

dry cotton rag. This must be done while the cement is still soft.

The joint should not be disturbed immediately after the cementing

procedure, and sufficient time should be allowed for proper curing

of the joint. Exact drying time is difficult to predict because it depends
on variables such as temperature, humidity and cement integrity.

For more specific information, you should contact your solvent

cement manufacturer.

21

This manual is related to the following products: