FILLING THE BOILER

HOW A HOT WATER SYSTEM OPERATES

The entire heating system (boiler, piping, and radiation units) is filled with water. As the water in the boiler

is heated, it is circulated from the top of the boiler through the supply main to the radiation units. The cooler

water in the radiation units flows back through the return piping through the return main into the boiler. This

arrangemenl provides positive and rapid response to the thermostat.

FILLING THE SYSTEM WITH WATER

OPTION #1 - This method utilizes the boiler piping as shown in the figure on the previous page.

a) Close the main shutoff valve, isolation valves, and zone valves (if applicable). If bypass piping is

installed, also close the two throttling valves. Leave the boiler service shutoff valve (if installed) and the

balancing valves to each heating zone fully open.

b) Open the following valves in order: the drain valve for power purging, isolating valves before and after

the boiler circulator (if applicable), both throttling valves (if applicable), and then open the fill line

shutoff valve. Water will fill the bypass piping and push the air through the piping and out the power

purging drain valve. When the power purging drain valve runs air free, close the bypass piping throttling

valve (leaving the throttling valve to the supply piping fully open).

c) Next, open the isolation valve (or zone valve) to the first zone. Water will fill the piping and push any air

out the power purging drain valve. When the power purging drain valve runs air free, close the isolation

valve or zone valve). Repeat this procedure for the remaining heating zones.

d) Once all zones are filled with water and purged of air, close the power purging drain valve and fill line

shut off valve, open the main shutoff valve, and adjust the throttling valves and balancing valves as

required.

OPTION #2 - Close the air vents on all radiation units. Open the valves to the radiation units. Make sure
the boiler drain valve, expansion tank drain cock, and the air bleed screw on the expansion tank drain fitting
are closed. Open the fill valve on the piping to the expansion tank. Open the water inlet to the boiler and
leave it open. Open the air vent on the lowest radiation unit. When all the air has escaped and water starts to

flow from the vent, close it. Go to the next radiation unit, and repeat this process until finishing with the

highest radiation unit. If the heating system has automatic vents, this manual venting is unnecessary but it

will speed up the proper filling of the system.

If the system is a closed expansion tank system, an automatic fill valve is needed. Leave the automatic fill
valve open to refill the system automatically as needed. Note the initial fill pressure on the boiler’s

temperature / pressure gauge, which should be 10-15 psig. Any lowering of the pressure from its initial fill

pressure indicates a loss of water due to leakage. The automatic fill valve should then compensate for this
water pressure loss. If it does not, manually open this valve to refill the system until the needle is again

pointing to the same pressure reading. Instmctions are packaged with the valve.

19