beautypg.com

E important, 0 important (cont.), 0 finish the wall opening – GE AEE08AR User Manual

Page 13

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Through-the-Wall Installation Instructíons—Optíonal

The case may be installed through-the-wall in

both existing and new construction.

Read completely, then follow step-by-step.

NOTE: Obtain all materials locally for mounting

the air conditioner through-the-wall.

E IMPORTANT

Through-the-wall installation is not appropriate

if any of the side or top louvers in the case will
be obstructed by the wall.

All side and top louvers in the case must project
on the outdoor side of the wall.

The room side of the case must project into the

room far enough to maximize the balance of the
unit.

The case must be installed level from side-to-

side and with a slight tilt from front to rear. Use
a level; no more than a 1/2 bubble will be the
correct case slant to the outside.

Lintel angle is required to support bricks or
blocks above opening.

Flashing is required and should extend the
length of the opening to ensure no inside cavity
leakage occurs.

0 Remove the air conditioner from the cose.

For specific instruction, refer to the Window

Installation Instructions.

0

Make certain that a wall receptacle is available

close to the hole location or make arrangements

to install a receptacle.

Place the case in the wall opening and place wood

support strips between the case bottom and the

flashing on both sides of the bottom rail. They

should be the same height as the bottom rail and

the same length as the wall opening.

0 IMPORTANT (cont.)

m

Secure with 14 wood screws anchored at least an

inch into the wall support structure.

NOTE:

Drill pilot holes, if necessary, for proper

installation. If the frame is oversized, use shims to

prevent case distortion.

13

0 FINISH THE WALL OPENING

0 Caulk all four sides on the outdoor side of the case

to prevent moisture from getting through to the

interior wall. Use of flashing (drip rail) will further

prevent water from dripping inside the wall and

down the outside of the building.

Place the air conditioner into the case.

Lintel angle

Caulking

OUTSIDE

Air louvers (top
and sides mus'
project on th'
outdoor side of
the wall)

Wood filler and
caulking (above an
below the flashing'"

Flashing

(Drip rai

Plaster line

Trim molding (if
desired)

INSIDE

Bottom rail

Flashing

(Drip rai

Wood support strips

^ For specific instruction, refer to the Window

Installation Instructions.

This manual is related to the following products: