Getting started – Boekel Scientific 270500 Thermo Shaker User Manual
Page 5
3. Getting Started
3.1
Unpacking
Remove packing materials carefully, and retain for future shipment or storage of the unit.
3.2
The
Groovin’ Tubes
unit includes:
●Thermo-shaker ………………………………...............................1 piece
●External Power Supply ..............................................................1 piece
●Operating Instructions.…..............................................……..….1 copy
●Plug Adapter Kit for UK-Europe-Australia ………………………..1 kit
Note: Atleast one block is required for operation, see 3.3
3.3
Blocks available for purchase
●270590……………………………………..20 x 1.5/2.0 ml microtubes
●270591…………………………................20 x 0.5ml + 12 x 1.5ml microtubes
3.4
Installing blocks
On the underside of the block you will find a small 6 way plug, connect the flying lead (2)
from the unit. Align the block so that the warning label is facing the front of the unit and
secure with the four thumb screws included with the unit.
3.5
Changing blocks
Remove the four thumb screws (1) and disconnect the 6 way plug.
Select the new block and assemble as in paragraph 3.4.
1
2
N2400305, Feb 2007, Rev. 0
Page 5
270500
Operating Instructions