Behlen 54140358S User Manual
Page 2

Back-to-Back Assembly Instructions
When using stall waterers back-to-back, the supply line must be split and routed to both waterers. The
vertical supply line should be long enough to reach inside the stall waterer. Once inside the stall waterer,
use a 3/4" pvc-T to connect a supply line that runs through the mounting wall to the other stall waterer.
Connect another supply line to the top of the pvc-T, then connect to the valve using a hose barb.
F-20539
9-26-07
Back-to-Back Installation
Mounting ASW
to Wall
Running Supply Line Through Mounting Wall