Assembly instructions – Behlen 62173602 User Manual
Page 2

6. After the trailer brackets have been attached,
move the trailer to the chute by hand and hook
the rear cogs in the chute trailer to the newly
attached chute brackets. (See Below)
Once these are in place, apply downward
pressure to the hitch area of the trailer and insert
the slide pins in the front channel of the trailer on
each side. (See Below)
Rotate the slide pins towards the rear of the chute
lining up the safety pin holes and insert a lynch
pin on each side to secure the slide pins.
PLEASE NOTE:
The coupler hitch requires a 2” ball to tow the
trailer and chute.
15” tires are to be provided by the end user.
CAUTION! TOWING SPEED NOT TO EXCEED 20
MPH - NOT INTENDED FOR HIGHWAY USE
The safety chain provided must be attached to
the towing vehicle.
ASSEMBLY INSTRUCTIONS
The chute and
trailer have been
designed to be
evenly balanced
for easy
maneuverability.
Applying
downward
pressure to the
rear of the attached
chute will easily
raise the tongue.
F-19974
4-23-03