4.5 Laying suction and pressure lines

4| Compressor assembly

4.4 Pipes

Pipes and system components must be clean and dry inside and free of scale, swarf and layers of

rust and phosphate. Only use air-tight parts.

Lay pipes correctly. Suitable vibration compensators must be provided to prevent pipes being

cracked and broken by severe vibrations.

Ensure a proper oil return.
Keep pressure losses to an absolute minimum.

Fig. 12

Rigid
fixed point

As short as
possible

A rule of thumb: Always lay the first pipe section starting from the shut-off valve downwards
and parallel to the drive shaft.

ATTENTION Improperly installed pipes can cause cracks and tears, the result

being a loss of refrigerant.

INFO

Proper layout of the suction and discharge lines directly after
the compressor is integral to the system’s smooth running and
vibration behaviour.

1

2

3

4

5

6

7

8

9

10

11

12

13

The

pipe connections have graduated inside diameters so that pipes with

standart millimetre and inch dimensions can be used.

The connection diameters of the shut-off valves are rated for maximum

compressor output.

The actual required pipe cross section must be

matched to the output. The same applies for non-return valves.

Fig. 11: graduated
internal diameter