ChemoMetec NC-250 User Manual
Page 19

1 Inspection, Unpacking and Installation of Equipment
991-0251 Rev. 1.0
Feb-2013
3
1 Inspection, Unpacking and Installation of Equipment
Upon receiving the shipment from ChemoMetec A/S, the box or boxes should be carefully
inspected for any damage that may have occurred during shipping. Any damage must be
reported to the carrier and to ChemoMetec A/S immediately.
Unpack the parts, saving the packing materials for possible later use. Also be sure to save
the User’s Guide, for instruction and reference.
Verify that the ChemoMetec packing list received refers to the correct and ordered
materials, and that nothing is missing.
If any part of the order was damaged during shipping or is missing, or fails to operate,
please contact ChemoMetec A/S.
The document supplied with the instrument
2
:
NucleoCounter_NC_250_IQ.pdf
Describes in details how to inspect, unpack and install the NucleoCounter® NC-250™
instrument and the NucleoView™ NC-250™ software. This IQ will also ensure that the
instruments basic functions correspond correct.
Operation of the NucleoCounter® NC-250™.
Before starting to use the NucleoCounter® NC-250™, it is important to refer to the
following document:
NucleoCounter_NC_250_OQ.pdf
This document presents a procedure, which upon successful completion will assure that
the advanced functions of the instrument are executed correctly.
Once the IQ and the OQ are finalized successfully, actual operation with the
NucleoCounter® NC-250™ can begin.
2
This document is present in the DATA folder on the USB Flash drive supplied with the
instrument