5 .3 installation – BUCHI Fraction Collector C-660 User Manual
Page 16

5 Putting into operation
16
C-660 Operation Manual, Version F
5 .3
Installation
5 .3 .1
Power connection
Connect the power cord.
Fig. 5.1: Connecting the power cord
5 .3 .2
Fitting and ferrule
1
2
3
The tubing a containing the fraction comes
from the chromatography column. The fitting
b and ferrule c are attached to the free end.
Mount the fitting b and ferrule c.
Press the suction tubing
a and the ferrule c
against a table surface to firmly seal the tubing
end with the ferrule.
Fig. 5.2: Installing fitting and ferrule
5 .3 .3
Optional waste diverter valve
If the flow rate of the pumps exceeds 10 mL/
min a waste diverter valve is recommended.
To install the waste diverter valve, proceed as
follows:
Screw the tubing coming from the detector
into the inlet a. Outlet b leads to the collec-
tion arm of the fraction collector.
Ensure that the FEP tubing c is long enough
to reach even the farest corner position of the
collector arm h. Outlet d leads to the waste
bottle.
The waste diverter valve can be fixed at the
back side of the fraction collector.
3
4
2
1
2
4