beautypg.com

BUCHI Rotavapo R-250 User Manual

Page 30

background image

30

Rotavapor R-250

6 Maintenance

6.4 Changing the Seals on the Distribution

Head

s

on all 3 bolts, but do not screw the nuts completely off.

s

s

carefully lift the distribution head off the glass assembly.

s

ቢ laid in at the front and replace it.

6.5 Installing and Removing the Vacuum Seal

During the running-in phase, which lasts approx. 10 hours,
the seal may show signs of increased wear. This is normal
for a PTFE seal.

s

the distribution head.

s

s

and pull the seal out.

s

inside and the metal guide ring facing outward.

s

in-side.

s

s

s

the seal.

s

up and in, and hand-tighten all 3 knurled nuts.

The unit should be tested for leaks each time the vacuum
seal has been removed.

Fig. 6.6: Taking out the Vacuum Seal

Fig. 6.5: Replacing the seal in the distribution head