STIEBEL ELTRON VERTICAL TILT RACK 45 User Manual
Page 2

17 West St., W. Hatfi eld, MA 01088
|
800.582.8423
|
413.247.3380
|
fax 413.247.3369
|
|
www.stiebel-eltron-usa.com
Simply the Best
INSTALLATION INSTRUCTIONS
VERTICAL TILT RACKS - 45 SIDE-BY-SIDE ORIENTATION
Table of Contents
1 Assembling the vertical tilt rack
2 Mounting
2.1 Mounting on an asphalt roof
2.2 Mounting on a raised-seam roof
!
CAUTION: READ ALL INSTRUCTIONS BEFORE
INSTALLING THIS KIT. ADDITIONAL ITEMS WILL
BE NEEDED TO MOUNT THIS ASSEMBLY.
This manual is intended to aid in the installation of 1-4
Stiebel Eltron SOL 27 Premium collectors tilted off of an
asphalt roof in a side-by-side vertical orientation. This
kit allows for quick and easy roof mounting of collectors.
Please contact Stiebel Eltron, or visit our website for more
information.
1. Familiarize yourself with the parts necessary to install
this solar kit. The parts are pictured below:
2. Consult the table below to make sure you have the
right number of components for the appropriate number of
collectors.
Part:
# of Collectors in Array:
1
2
3
4
# of Parts Required:
45 Vertical tilt rack
2
2
3
4
Vertical X-Brace
1
1
2
2
Single mounting frame kit
1
0
1
0
Double mounting frame kit
0
1
1
2
Frame connector kit
0
0
1
1
Roof attachment kit
4
4
6
8
3. Begin the assembly by removing the racking
components from their boxes. Insert the M-101 triangular
connector into the inside of the M-103 65˝ rail as shown
below. Using the M10 nuts & bolts, fasten the two parts
together.
4. Repeat the process with the other M-103 65˝ rail using
two more M10 nuts & bolts.
5. Again repeat the process with two more M-101
triangular connectors on the ends of each rail.