Table 1. chassis id switch settings -2 – CANOGA PERKINS UCS 1002 Universal Chassis System User Manual
Page 10
EdgeAccess Universal Chassis System
Figure 2. Chassis Backplane With CID Switch and Ground Options at Slots 14 and 15
4. Determine the number for this chassis within the domain, then locate the DIP switch inside
the chassis on the backplane between the power supply connectors; see Figure 2. Check that
the power is off, then use a non-conductive device to set the switches CID0, CID1, and CID2
according to the data in Table 1. The remaining switch is reserved.
Table 1. Chassis ID Switch Settings
Chassis ID Number
CID0
CID1
CID2
1
Closed Closed Closed
2 Open
Closed
Closed
3 Closed
Open
Closed
4
Open Open Closed
5
Closed Closed Open
6 Open
Closed
Open
7 Closed
Open
Open
8
Open Open Open
5. Plug the wire from Earth Ground into the lug on the back of the chassis; this connects the
chassis to Earth Ground.
6. Mount the chassis in a standard 19-inch relay rack, in a 23-inch rack, or on a table top. The
chassis ships with mounting brackets preconfigured for flush mounting in a standard 19-inch
relay rack; you can reposition the brackets as needed.
• For a 19-inch rack, position the chassis in the rack and secure the brackets to the rack
with four screws. See Figure 1.
• For a 23-inch rack, remove the mounting screws for the 19-inch mounting brackets and
secure the optional 23-inch mounting bracket with the screws, then position the chassis in
the rack and secure the brackets to the rack with screws.
• For a tabletop, select a flat surface in a secure location, turn the chassis up-side-down and
attach the self-adhesive feet near the four corners of the chassis, then turn the chassis
right-side up and place it on the flat surface.
2-2
UCS 1002 User Manual