beautypg.com

Thermal well testing, Gas control testing – Bradford White TW4-75S-76B-3X User Manual

Page 23

background image

Thermal Well Testing

Position gas valve power

switch to the “OFF”

position and disconnect

thermal well harness from

gas control.

N

Y

Using a multi-meter set to the ohms setting, insert one meter probe into center wire

position of thermal well connector, insert the second probe into either of the outside

wire positions (see photo 19).

Alternate the probe on the outside position to the opposite outside wire position

(see photo 20).

Replace thermal well

(see page 25)

Using a multi-meter set to

the Ohms setting,

determine the resistance of

thermal well sensors 1 & 2

(see photos 19 & 20)

Disconnect thermal

well wire harness

19

20

Thermal well OK

TTW SERVICE PROCEDURE VI

Gas Control/Thermal Well Testing and

Replacement

Page 23

Gas Control Testing

See pages 24 & 25 for gas control

input & output testing.

Once the thermal well resistance values are known, the water

temperature must also be known to determine if the resistance

values are correct. See page 24 to obtain water temperature.

Are thermal well resistance values correct?

23

This manual is related to the following products: