beautypg.com

Bradford White 55X-80B-3X User Manual

Page 7

background image

Figure 6

OPEN CIRCUIT THERMOPILE TESTING

Step 1. Disconnect red and white thermopile wires from the wire harness leading to the gas control.

Step 2. Using a multimeter capable of reading millivolts, check across thermopile leads.

Step 3. Following the instructions located on the lighting instruction label or the lighting instructions located in the

installation and operation manual, proceed to light the pilot and allow the gas control to operate for three
minutes.

Step 1. Closed circuit testing is the preferred method for testing the thermopile. Following the instructions

located on the lighting instruction label or the lighting instructions located in the installation and operation
manual, proceed to light the pilot and allow the control to operate for three minutes.

Step 2. Using a multimeter capable of measuring millivolts, measure across thermopile connections at the

gas control (see Figure 6).

CLOSED CIRCUIT THERMOPILE TESTING

Thermopile

Connections at gas

control

Page 7

Figure 5

Gas Control

Knob

SERVICE PROCEDURE AG-I

Thermocouple Testing and Replacement

For Models Using Honeywell Gas Control

NOTE:

It may be necessary to hold the gas
control knob down in the “PILOT” position
continuously throughout this test.

NOTE:

It may be necessary to hold the gas
control knob down in the “PILOT” position
continuously throughout this test.

In a CLOSED CIRCUIT test:

Any reading over 300 millivolts
indicates good thermopile output.
For readings under 300 millivolts
replacement of thermopile is
recommended.

In an OPEN CIRCUIT test:

Any reading over 400 millivolts
indicates good thermopile output.
For readings under 400 millivolts
replacement of thermopile is
recommended.

7