beautypg.com

Figure 4-6 stacking the sehi – Cabletron Systems SEHI100TX- User Manual

Page 30

background image

Chapter 4: Installation

4-8

SEHI100TX User’s Guide

4. Verify that the PWR LED is on, indicating that the SEH is receiving

power.

5. Attach the HubSTACK Interconnect cable provided with the SEH to

the “IN” port on the rear panel of the SEH as shown in Figure 4-6.

6. Attach the other end of the interconnect cable to the “OUT” port on the

rear panel of the hub at the bottom of the stack.

7. Repeat steps 3 through 6 until all SEH hubs are connected.

Figure 4-6

Stacking the SEHI

!

C AUT IO N

Do NOT connect the interconnect cable between the SEH and
the SEHI before powering up the SEH. Otherwise damage to
the SEH may result.

!

C AUT IO N

Do not leave an interconnect cable connected at only one end
during network operation. Corrupted data may result.

100BASE-TX HubSTACK
Interconnect Cable

REAR VIEW
SEHI Managing 4 SEH Non-Intelligent Hubs

OUT

SEHI100TX INTERCONNECT

IN

SEHI

100TX

-22

100BASE-TX HUB

WITH

LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

1511_07

SEHI Book Page 8 Wednesday, May 15, 1996 10:42 AM