Start--up checklist – Carrier 50VL---A User Manual
Page 30

30
START--UP CHECKLIST
(Remove and Store in Job Files)
I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:
II. PRESTART--UP (Insert check mark in box as each item is completed)
( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
( ) VERIFY THAT UNIT INSTALLATION IS LEVEL
( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
III. START--UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR (EVAPORATOR) FAN AMPS
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE
DB
RETURN--AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
DB
WB
PRESSURES
REFRIGERANT SUCTION
PSIG, SUCTION LINE TEMP*
REFRIGERANT DISCHARGE
PSIG, LIQUID TEMP{
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
* Measured at suction inlet to compressor
{
Measured at liquid line leaving condenser.
Copyright 2011 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231
Edition Date: 01/11
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Catalog No:50VL---08SI
Replaces: 50VL--- 07SI
50V
L
--
A