Workrite Verano User Manual
Ab a b, Ca b, Verano installation instructions
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Installation Instructions for Verano™
#1500149 - Rev E
Verano Installation Instructions —
single unit, or parent unit of daisy chain
(see reverse for child unit installation)
Determine if light will be affixed to a metal or wood cabinet and follow the appropriate step below.
If installing parent unit of daisy chain, be sure to position parent unit so that it can be connected to the additional unit with its supplied jumper cable.
Snap Magnetic Mounts (C or D) onto back
rail. For Rotating Mounts, orient flat sides
of Magnetic Mounts with the length of the
Verano.
1
A
Light Fixture
Qty: 1
C
Rotating Magnetic Mounts
Qty: 3
E
Rotating Wood Mounts
Qty: 3
Metal cabinet mounting:
2
B
Transformer
Qty: 1
Max 4.0A output
D
Fixed Magnetic Mounts
Qty: 4
F
Fixed Wood Mounts
Qty: 3
Attach Wood Mounts (E or F) to underside
of cabinet with Wood Screws. (G). If using
3 mounts, be sure they are positioned in a
straight line.
Wood cabinet mounting:
Note: You will need a Phillips-head screwdriver to complete this step.
Plug transformer (B) into wall
3
G
M4
Wood Screws
Qty: 9
a
a
b
a
b
H
Power Connector
Qty: 1
Note: All mount options allow fixture to slide from side to side - mounts can be positioned up to 6” from edge of fixture.
!
OR
Under-Cabinet
Under-Cabinet
“SNAP”
“SNAP”
Under-Cabinet
Align at side
with back rail
Press down to
snap into rail
“SNAP”
Place lamp on
under-cabinet
“SNAP”
1" - 6"
var.
1" - 6"
var.
a
b
a
b
Align mounts parallel
to edges of cabinet
I
Cable Clips
Qty: 2
.75
Replacement parts
Daisy Chain Jumper Cords, 24” ................................................................................................ VER-DC24
Daisy Chain Jumper Cords, 48” ................................................................................................ VER-DC48
Max 4.0A (12 volt) transformer ................................................................................................ VER-T45
Verano hardware pack (contains qty 3 each of parts C, E and F, 4 of D, and qty 9 of G) .................. VER-HDWR
Maximum Daisy-chained units: Number of fixtures within same chain with 4.0A
12V transformer
VER-24
1
1
2
1
1
2
2
3
4
VER-36
1
1
2
1
2
1
3
VER-48
1
1
2
1
1
Total/Chain
2
2
2
2
2
2
3
3
3
3
3
3
4
CAUTION – To reduce the
risk of fire, electric shock
or injury to persons refer
to the chart at right for
maximum daisy-chained
units:
!
E
c
a
b
Plug in
Plug in
On/Off
Plug in
d
B
I
A
C
A
G
Plug power cord into Verano unit end
b
Press power button on Verano to turn on/off.
c
Use Cable Clips (I) as needed to secure cord.
d
Attach Light Fixture (A) to metal under-
cabinet. Magnets will hold Verano in place.
D
Snap Light Fixture (A) onto mounts to hold
in place.
OR
F