Inspection and start up checklists, Receiving and inspecting, Handling and installing – Wine Guardian Ducted Split Wine Cellar Cooling Systems (SS200) User Manual
Page 55: Starting-up the unit, Unit mounted on solid level surface, Proper electrical service provided, Water provided to humidifier, Drain lines and trap installed properly, Ductwork, fittings and grilles installed properly, All cold duct surfaces insulated

50
Inspection and Start Up Checklists
Receiving and Inspecting
Unit received undamaged
Unit received complete as ordered including accessories
Handling and Installing
Unit mounted on solid level surface
Sufficient space allowed for access to unit and accessories
Proper electrical service
provided
Water provided to humidifier
Drain lines and trap installed properly
Ductwork, fittings and grilles installed properly
All cold duct surfaces insulated
No obstructions to air flow around condensing unit
Starting-up the Unit
General visual inspection looks good.
All wiring connections checked
All ducts, grilles and panels in place
Start unit
Check ducts and connections for air leaks
Balance air distribution
Confirm condenser airflow is unrestricted
Verify cooling and heating operation
Check for excessive noise or vibration