beautypg.com

Inspection and start up checklists, Receiving and inspecting, Handling and installing – Wine Guardian Ducted Split Wine Cellar Cooling Systems (SS200) User Manual

Page 55: Starting-up the unit, Unit mounted on solid level surface, Proper electrical service provided, Water provided to humidifier, Drain lines and trap installed properly, Ductwork, fittings and grilles installed properly, All cold duct surfaces insulated

background image

50

Inspection and Start Up Checklists

Receiving and Inspecting

 Unit received undamaged
 Unit received complete as ordered including accessories

Handling and Installing

 Unit mounted on solid level surface

 Sufficient space allowed for access to unit and accessories



Proper electrical service

provided

 Water provided to humidifier

 Drain lines and trap installed properly

 Ductwork, fittings and grilles installed properly

 All cold duct surfaces insulated

 No obstructions to air flow around condensing unit

Starting-up the Unit

 General visual inspection looks good.

All wiring connections checked

 All ducts, grilles and panels in place

 Start unit

 Check ducts and connections for air leaks

 Balance air distribution

 Confirm condenser airflow is unrestricted

 Verify cooling and heating operation

 Check for excessive noise or vibration