1. Carefully remove the Moisture Analyzer and all its components from the packaging and place
them on a stable base where the unit will not be affected by any mechanical vibrations or air
movements.
2. After removing the Pan Shield (4), Pan Support (5), and Pan Handle (6) from their packaging,
open the Drying Chamber (3) and carefully install the Pan Shield (4) on the three Pan Shield Posts
(8).
3. Once the Pan Shield is installed on the shield posts, gently insert the Pan Support (5) into the
opening of the Analyzer’s mechanism.
4. After installing the Pan Support, place a Disposable Pan (7) on the Pan Handle (6), then place it on
the Pan Support so that the handle rests on the Pan Shield without touching the Pan Support.
5. After installing all pan components, close the Drying Chamber and level the Analyzer by adjusting
the leveling feet until the level indicator shows the “air bubble” is in the center position of the
sight glass. The level indicator is located on the rear left side of the unit.
6. After leveling the scale, plug the power supply cable into the power supply socket (Marked 110V)
located in the rear of the Analyzer.
7. Make sure the drying chamber is closed, and then plug the power cable into the wall outlet.
8. When the cable is plugged into the wall outlet, the Analyzer will turn “ON” automatically,
initialize itself, and perform Initial Heating. The Initial Heating is designed to drive any residual
moisture from the heating chamber. The internal temperature is raised to 105°C and held there for
a preset time period
9. Upon completion of the power-up sequence, the unit comes up in the Moisture Analyzer Mode and
is then ready to be used.
WARNING: