Smart Power Systems HR-12 50 Hz User Manual
Page 17
Smart Power
®
Systems
A. C. MODULAR GENERATOR SYSTEM
Page 16 of 54
a. Locate a position to mount the SPS Command & Control Center. The ideal
location for the Command & Control Center will be in an area that is easily seen
and accessed by the generator operator. When the generator system is in use,
the Command & Control Center will continuously show the status of the
generator, including faults (warnings) if they occur. The Command & Control
Center can also be used to engage and disengage the generator. The
Command & Control Center is water sealed, and operates on low voltages so
pump house mounting is permissible. A 15 ft. water sealed harness is provided
to connect the Command & Control Center to the system controller mounted
within the generator tray assembly. See figure 6 for the dimensions of the
Command & Control Center.
4.25
4.25
1.375
.45
Command & Control Center, P/N 1500047
Figure 6