S U N C O N T R O L - I N S T A L L A T I O N M A N U A L
SOLAR ECLIPSE
™
WW-107-01
WW-162-02
Install WW-107-01 anchor with
(4) 3/8"-16" 7/8" S.S. button
socket head bolts. Prior to
installing glass.
FIGURE 7
Reliance Assembly
3/8" hex jamb nuts
& washers
FS-325
(#12 x 1
1
2
" hwh
drill-flex)
1.2 Assembly
10) Hardware required for attachment of standard anchor (WW-107-01) will be contained in the
hardware package, (part. no. 12854). This package contains (1) one WW-162-02 cover plate,
(4) four 3/8"- 16 x 7/8" stainless steel button socket head bolts, nuts and washers and (4) four
3/8"-16 x1-1/4" stainless steel hex head bolts, nuts and washers. (Size and quantity of bolts
may vary based on project requirements, consult engineer for specific job applications).
11) Attach anchor to mullion by first inserting anchor into cutout in face of mullion tongue. Attach
anchor using the 3/8"-16 x 7/8" S.S. button socket head bolts, washers and securing using
the 3/8"-16 S.S. jamb nuts. Repeat for each of the 4 bolts. See
FIGURE 7
(Size and
quantity of bolts may vary based on project requirements, consult engineer for specific job
applications).
12) Once system is glazed. Install section of GP-103 gasket onto WW-162-02 cover plate and
install plate over anchor attaching to mullion using (2) two FS-325 (#12-14 x 1-1/2" HWH
Drill-Flex fasteners).
Note: Due to reduced clearance for attachment of anchors, special care must be taken when
installing glass.
Notes:
1) Assembly package part no. 12854 required.
2) Anchor must be installed prior to glazing.
3) Glass clearance at anchor is reduced to 3/16",
of glass.