04_cw-250, Cw-250 fabrication, Figure 1 figure 2 – Oldcastle BuildingEnvelope Solar Eclipse User Manual
Page 4
4
S U N C O N T R O L - I N S T A L L A T I O N M A N U A L
SOLAR SHELF
CW-250 FABRICATION
™
C
FIGURE 1
FIGURE 2
Centerline of
Sunshade Anchor
Notch top of lower cap
and bottom of upper cap
as shown.
134"
134
"
SYM
134"
7
8
"
134"
134
"
Drill 5/16" dia. holes
(6) places
9
16"
212"
314"
1 3
32"
5
16"
Centerline of
Sunshade Anchor
1.1 Fabrication
1) Locate the centerline of each sunshade anchor. The standard sunshade anchor for
(CW-2058) for CW-250 will require (6) six 5/16" clear holes for attachment. See FIGURE 1 for
hole locations. ( Size, locations and quantity of bolts may vary based on project requirements,
consult engineer for specific applications.)
2) Face caps must be notched to clear anchor. Face caps are cut at centerline of sunshade,
notched on ends. Notch per FIGURE 2.
Installation Notes:
1) Face cap will be notched above and
below anchor. See FIGURE 2 for
fabrication.
2) Slide cap over anchor and snap into
position.
3) Butt splice cap at centerline of anchor.
Note: CW-2 face cap shown, notch
similar for custom applications.