Assembly step 1, Step 2, Step 3 – General Hydroponics AF60 User Manual
Page 3: Step 5, Step 4

ASSEMBLY
STEP 1
Place the Reservoir with the
lid and hatch cover where it
will be used on a level surface.
Line the inside of the Reservoir
grommet with a thin coat of
the Silicon Grease. Insert Drain
Valve into grommet using a
twisting motion.
STEP 2
Attach the Pump Inlet and the
Filter Outlet Assembly to the
TNC Pump. Position the filter
to the side to avoid splashing
the pump with water when
cleaning the filter. The filter
should be cleaned monthly
by rinsing with warm water.
STEP 3
Line the inside of the Reservoir
grommet with a thin coat of
the Silicon Grease and insert
the Pump Inlet that is attached
to the TNC pump. Attach the
strainer from the inside of the
reservoir to the Pump Inlet.
STEP 5
Remove the Laser Sprayline and Drain Level Tube from each of the Growing Chambers.
Follow the included directions on inserting the Laser Spraylines into each Growing
Chamber. Line the inside of the Growing Chamber grommet with a thin coat of the
Silicon Grease and insert the
Drain Level Tube half way
into the grommet. Repeat for
the rest of the chambers. The
water level of the Growing
Chambers is adjusted by
raising or lowering the Drain
Level Tubes.
STEP 4
Assemble the SnapStand by
sliding the two Support Legs
into the SnapStand Bases and
the SnapStand Cross Fittings.
Snap the Cross Support into the
SnapStand Cross Fitting and
place the SnapStand approxi-
mately 5ft from the reservoir
(the second set of SnapStands
are only used when staggering
the Growing Chambers).
note:
this opening is the
lower of the two
note:
this opening
is the higher
of the two