EFCO CORPORATION 6/2012 PART NO. Y350

Page 7 of 16

Series 5900 Outside Glazed Curtain Wall Installation Instructions

Section III: Anchor Installation

Anchor Installation

A.)

Attach anchors to mullions with temporary alignment screws as shown below.

B.)

Install the vertical mullions in position, and attach anchors to the building structure
per the “APPROVED” shop drawings.


Use #12 X 1” Tek screw for
alignment only. The screw

must be removed after

installation of the thru bolt at

the wind load anchor to allow

for thermal expansion and
contraction.

High impact polystyrene
horseshoe shim

Welded to building structure

Weld to building

structure per
“APPROVED”

shop drawings.

A steel plate is factory
welded to the channel

anchor and is sized per

the job requirements.

Refer to the “APPROVED”

shop drawings.

Size and locate anchor
bolts based on the job

conditions and structural

requirements. Refer to

the “APPROVED” shop

drawings.

Wind Load Anchors

Wind Load Anchors

Dead Load Anchors

Welded to building structure

After final alignment
of mullion, align drill

mullion in best hole

location. Note that

the hole must be a

minimum of 1” from

the back of the
mullion to clear any

steel reinforcement

required for the job.

Bolted to building structure

Dead Load Anchors

Bolted to building structure

Note: Elevation of slabs must be within adjustment limits of the anchorage

system. See “APPROVED” shop drawings for allowable adjustment.