beautypg.com

Notice, Caution – Compact Power BOXER 999-823 User Manual

Page 45

background image

3-17

Pre-Start Inspection and Operation

4. With your right hand, move the trencher control lever (Item 1,

Figure 3–19

) to the right to

activate the trencher chain in the FORWARD motion.

The control will remain in the forward position until you either move the lever into the Neutral

position or step off the operator presence control.

Figure 3–19 Trencher Chain Control Lever in Forward Position

5. Using the boom lower control, slowly rotate the trencher boom downwards until it makes

contact with the ground. See

Figure 3–20

. Continue to slowly lower the trencher boom, but

do not move the machine.

• Use extreme caution while making the initial trenching cut. Surface rocks and

debris may shatter when contacted by the trencher chain.

• Keep all workers at least 10 feet from the trenching operation.

Figure 3–20 Initial Trenching Cut

NOTICE

1

2440

CAUTION

2442