Alumax 650S User Manual
Page 6

EPH-N00-06015
1-29-09
Page 6 of 8
9
7
8
Lift the interior panel (with the rough surface closest
to the top fin) into position with the rollers engaging the
roller slot in the header
[F].
Repeat for the exterior panel (rough surface away from
the top fin).
If the door panels are not parallel to the wall jambs, re-
move them from the header and adjust the rollers up or
down to compensate.
Before finishing the installation it is necessary to
determine the proper closed position of the doors. For
maximum water-proofing, position the interior panel clos-
est to the shower head, as shown in the detail.
Slide the two towel bar trim rings
[K] over the clear
acrylic towel bar brackets
[L] and press the brackets into
the ends of the towel bar
[M].