Preparation of chassis, Installation kits contents, Suggested tool requirements – LG L1810ER User Manual
Page 13
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Installation
Installation Kits Contents
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SUPPORT BRACKET
2
3
SILL BRACKET
2
4
LOCK NUT
4
5
SCREW (TYPE A)
11
6
SCREW (TYPE B)
7
7
SCREW (TYPE C)
5
8
SCREW (TYPE D)
2
9
CARRIAGE BOLT
2
10
FOAM STRIP
1
11
FOAM SEAL
1
12
WINDOW LOCKING BRACKET
1
13
DRAIN PIPE
1
14
FRAME GUIDE
2
Suggested Tool Requirements
SCREWDRIVER(Philips and Platead), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1j
Remove the screws which fasten the cabinet at both
sides and at the back.
^ Siide the unit from the cabinet by gripping the base pan
handle and puliing forward while bracing the cabinet.
^ Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-Seal ® to the
underside of the window sash.
^ Insert the Frame Guides ® into the bottom of the
cabinet.
^ Insert the Frame Curtain (3) into the Upper Guide and
Frame Guides®.
^ Fasten the curtains to the unit with 10 Type
A screws (5).
Shipping
Screws
Owner's Manual 13