Set-up, Chute assembly, Shear pins – Cub Cadet WO STAGE SNOW THROWER 930 SWE User Manual
Page 8: Chute clean-out tool
Check that the chute cables are properly routed through the
4.
cable guide on top of engine shroud. See Figure 3-6.
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
have been included with your snow thrower. There are holes
provided in the plastic dash panel for convenient storage of the
shear pins. Push the pins through the holes in the dash panel and
secure with the bow-tie cotter pins. See Fig. 3-7.
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
the cable tie before operating the snow thrower. See Fig. 3-8.
Insert the end of the chute directional control into the
2.
lower bracket and secure with the flat washer and hairpin
clip just removed. If necessary, the lower bracket can
be adjusted. Refer to Chute Bracket Adjustment in the
Maintenance & Adjustments section of this manual.
Chute Assembly
Remove lock nuts and screws securing one of the flange
1.
keepers to the chute assembly. Loosen the fasteners of the
other two flange keepers.
Place chute assembly onto chute base as shown in Figure
2.
3-4. Make sure that the chute notches engage with the
spiral end of chute directional control, and the two flange
keepers are beneath the flange on the chute base.
Secure flange keeper removed earlier with lock nuts and
3.
screws. Tighten down nuts securing the other two flange
keepers. See Figure 3-5.
Figure 3-4
Figure 3-5
Figure 3-6
Figure 3-7
8
s
ectiOn
3— a
sseMbly
& s
et
-u
p