beautypg.com

Set-up, Chute assembly, Shear pins – Cub Cadet WO STAGE SNOW THROWER 930 SWE User Manual

Page 8: Chute clean-out tool

background image

Check that the chute cables are properly routed through the

4.

cable guide on top of engine shroud. See Figure 3-6.

Set-Up

Shear Pins

A pair of replacement auger shear pins and bow tie cotter pins

have been included with your snow thrower. There are holes

provided in the plastic dash panel for convenient storage of the

shear pins. Push the pins through the holes in the dash panel and

secure with the bow-tie cotter pins. See Fig. 3-7.

Chute Clean-Out Tool

The chute clean-out tool is fastened to the top of the auger

housing with a mounting clip and a cable tie at the factory. Cut

the cable tie before operating the snow thrower. See Fig. 3-8.

Insert the end of the chute directional control into the

2.

lower bracket and secure with the flat washer and hairpin

clip just removed. If necessary, the lower bracket can

be adjusted. Refer to Chute Bracket Adjustment in the

Maintenance & Adjustments section of this manual.

Chute Assembly

Remove lock nuts and screws securing one of the flange

1.

keepers to the chute assembly. Loosen the fasteners of the

other two flange keepers.
Place chute assembly onto chute base as shown in Figure

2.

3-4. Make sure that the chute notches engage with the

spiral end of chute directional control, and the two flange

keepers are beneath the flange on the chute base.

Secure flange keeper removed earlier with lock nuts and

3.

screws. Tighten down nuts securing the other two flange

keepers. See Figure 3-5.

Figure 3-4

Figure 3-5

Figure 3-6

Figure 3-7

8

s

ectiOn

3— a

sseMbly

& s

et

-u

p

This manual is related to the following products: