Compliant installation, Ferrite beads – Carrier Access Bridge/Router 3104s User Manual
Page 6

6
Adit 3104 - Release 1.6
Quick Start
Installation
Compliant Installation
NOTE:
It is important the DS1/E1 Network Interface Cables are secured separately from the
power and Signal Cables.
1. Inspect the unit.
2. Mount the unit, see Wall Mounting on page 7, or Rack Mounting (Optional Feature) on page 8
for detailed instructions.
3. Ground the unit. See Grounding the Unit on page 12.
WARNING!
T
HE
A
DIT
3104
IS
REQUIRED
TO
BE
PERMANENTLY
GROUNDED
FOR
THE
PROTECTION
OF
USERS
AND
SERVICE
PERSONNEL
. R
EFER
TO
FOR
DETAILED
INSTRUCTIONS
.
4. Connect DS1 (T1), Ethernet and Amphenol connectors as needed.
Note: if Amphenol (25-pin telco) connector is used, a ferrite bead is required to meet
compliance (see graphic above).
5. Connect RS-232 connector and open Terminal Emulator software on your PC. Note: With this
running first, you can monitor the boot process.
6. Connect Power to the unit.
7. Monitor the boot process on your PC, when complete the status light should be green.
8. For any software enabled features, enter the key command. See the key command in the Adit
3000 CLI Reference Manual, for detailed information.
9. To verify use the show version command.
10. Now you can proceed to provisioning the unit. See Basic Configuration on page 23 for
information.
Ferrite Beads
To be compliant with EMI standards, a ferrite bead is required on the following cable:
Ferrite bead shipped with Adit chassis:
Ferrite Provided
Part Number
Intended For
1 large
P/N 010-0051
25-pair Telco cable (connector on the front of the Adit).