beautypg.com

Compliant installation, Ferrite beads – Carrier Access Bridge/Router 3104s User Manual

Page 6

background image

6

Adit 3104 - Release 1.6

Quick Start

Installation

Compliant Installation

NOTE:

It is important the DS1/E1 Network Interface Cables are secured separately from the

power and Signal Cables.

1. Inspect the unit.
2. Mount the unit, see Wall Mounting on page 7, or Rack Mounting (Optional Feature) on page 8

for detailed instructions.

3. Ground the unit. See Grounding the Unit on page 12.

WARNING!

T

HE

A

DIT

3104

IS

REQUIRED

TO

BE

PERMANENTLY

GROUNDED

FOR

THE

PROTECTION

OF

USERS

AND

SERVICE

PERSONNEL

. R

EFER

TO

Grounding the Unit

ON

PAGE

12

FOR

DETAILED

INSTRUCTIONS

.

4. Connect DS1 (T1), Ethernet and Amphenol connectors as needed.

Note: if Amphenol (25-pin telco) connector is used, a ferrite bead is required to meet
compliance (see graphic above).

5. Connect RS-232 connector and open Terminal Emulator software on your PC. Note: With this

running first, you can monitor the boot process.

6. Connect Power to the unit.
7. Monitor the boot process on your PC, when complete the status light should be green.
8. For any software enabled features, enter the key command. See the key command in the Adit

3000 CLI Reference Manual, for detailed information.

9. To verify use the show version command.
10. Now you can proceed to provisioning the unit. See Basic Configuration on page 23 for

information.

Ferrite Beads

To be compliant with EMI standards, a ferrite bead is required on the following cable:

Ferrite bead shipped with Adit chassis:

Ferrite Provided

Part Number

Intended For

1 large

P/N 010-0051

25-pair Telco cable (connector on the front of the Adit).