beautypg.com

Installing fibre channel cables, Removing fibre channel cables – Dell PowerVault MD3660f User Manual

Page 23

background image

Installing Fibre Channel Cables

WARNING: Data processing environments can contain equipment transmitting on system links with laser modules
that operate at greater than Class 1 power levels. Never look into the end of an optical fiber cable or open
receptacle.

Before installing an FC cable, see

Guidelines For Using Fibre Optic Cables

.

To install an FC cable:

1.

If applicable, remove the protective cap from the SFP module and store the protective cap for future use.

2.

Remove the two protective caps from one end of the cable and store them for future use.

3.

Insert the cable into an SFP module that is installed in the storage array. The cable connector is keyed for correct

installation. Holding the connector, push in the cable until it clicks into place.

4.

Remove the two protective caps from the other end of the cable and store them future use.

5.

Connect this end of the cable to one of the following devices:

– An SFP module that is installed in an FC switch port
– An FC HBA port

Removing Fibre Channel Cables

To remove an FC cable:

1.

Press and hold the lever to release the latches before removing the cable from the SFP module. Ensure that the

levers are in the released position when removing the cable. Do not grasp the SFP module plastic tab when

removing the cable.

2.

On the end of the cable that connects into the SFP module or HBA, press down and hold the lever to release the

latches.

3.

While pressing down the cable lever, pull the connector to remove the cable from the SFP module.

4.

Replace the protective caps on the cable ends.

5.

Replace the protective cap on the SFP module.

23