Installing the base, covers, and bezel – Dell PowerVault 221S (SCSI) User Manual
Page 10
1-8
Rack-to-Tower Conversion Guide
w
w
w
.d
e
ll
.co
m
|
s
u
p
p
o
rt
.d
e
ll.c
o
m
Installing the Base, Covers, and Bezel
1
To install the base:
a
Position the base assembly and align the two holes on its underside with the two
threaded holes on the right side (the base) of the chassis (see Figure 1-4).
b
Secure the two hex-socket-head screws and flat washers to the base using a
3/16-inch hex (Allen) wrench.
2
To replace the system right and left covers:
a
Raise the system into the tower position, resting on its base.
b
Position the covers on their respective sides of the chassis 12.7 millimeters
(0.5 inch) behind the front panel.
Tabs on the bottom of each cover should drop into slots in the base assembly.
c
Slide the covers toward the front panel until two holes on the top of the cover
align with two threaded holes in the system chassis.
d
Use a 3/16-inch hex (Allen) wrench to secure the two hex-socket-head screws and
flat washers into the two holes at the top of the system.
e
Install round covers over the screws you just installed (see Figure 1-4).
2H982bk1.book Page 8 Monday, November 5, 2001 10:12 AM