Great Plains 1006 Assembly Instructions User Manual
Page 9

8/2/2005
151-118M
Great Plains Mfg., Inc.
9
Installation Instructions
Seed Tube Assembly
Refer to Figure 11
17. Attach the fertilizer hoses (1) to the drop
tubes on the fertilizer box with ratchet clamps
(2).
18. Route the hoses behind the rear frame tubes
on the drill. Attach the opener adapter (3) to
the large hole in the opener and secure in
place with 10 x 3/8" machine screws.
19. Insert the fertilizer tube (4) into the opener
adapter (3) with the tube opening facing for-
ward. Secure in place with reinforcement ring
(5) and 10 x 3/8" machine screws.
NOTE: If small seeds are not being used you have
the option of using the rear most opener hole for
your preference in fertilizer placement. insert tube
(4) into the smaller hole. Attach with reinforce-
ment ring (5) and 10 x 3/8" machine screws.
20. Attach the fertilizer hoses (1) to the fertilizer
tubes using hose clamp (5).
Walkboard Assembly
21. Assemble walkboard on the end panels and
walkboard supports using hardware removed
in step 2 on page 6.
22. Attach SMV sign and add all safety and warn-
ing decals to the walkboard.
23. Refer to your Great Plains seed rate book and
operator’s manual for setup, calibration and
use.
Figure 11
Seed Tube Assembly
22565